{"id":299476,"date":"2022-11-15T17:05:54","date_gmt":"2022-11-15T16:05:54","guid":{"rendered":"https:\/\/zjarr.tv\/?p=299476"},"modified":"2022-11-15T17:05:54","modified_gmt":"2022-11-15T16:05:54","slug":"skandali-balluku-jep-pa-gare-koncesionin-320-mln-euro-per-zgjerimin-e-42-km-te-rruges-lekaj-fier-u-paraqit-vetem-1-oferte","status":"publish","type":"post","link":"https:\/\/zjarr.tv\/en\/skandali-balluku-jep-pa-gare-koncesionin-320-mln-euro-per-zgjerimin-e-42-km-te-rruges-lekaj-fier-u-paraqit-vetem-1-oferte\/","title":{"rendered":"Skandali, Balluku jep pa gar\u00eb koncesionin 320 mln euro p\u00ebr zgjerimin e 42 km t\u00eb rrug\u00ebs Lekaj-Fier. U paraqit vet\u00ebm 1 ofert\u00eb"},"content":{"rendered":"<p>Skandal me koncesionin 35 vje\u00e7ar p\u00ebr segmentin rrugor Lekaj-Konjat-Fier, pjes\u00eb e autostrad\u00ebs Milot-Fier.<\/p>\n<p>Ministria e Infrastruktur\u00ebs dhe energjis\u00eb drejtuar nga Belinda Balluku ka shpallur fituese ofert\u00ebn\u00a0 prej 320 milion euro dh\u00ebn\u00eb nga bashkimi i tet\u00eb kompanive, nd\u00ebrkoh\u00eb q\u00eb n\u00eb dokumentet zyrtar\u00eb t\u00eb shpalljes s\u00eb tenderit, projekti ishte parashikuar me nj\u00eb kosto prej 317,6 milion euro.<\/p>\n<p>N\u00eb k\u00ebt\u00eb m\u00ebnyr\u00eb vlera e koncesionit \u00ebsht\u00eb tejkaluar me 2,4 milion euro. Edhe pse financimi \u00ebsht\u00eb krejt\u00ebsisht privat, Ministria e Infrastruktur\u00ebs nuk \u00ebsht\u00eb kujdesur aspak q\u00eb t\u00eb k\u00ebrkoj\u00eb oferta m\u00eb t\u00eb lira, n\u00eb m\u00ebnyr\u00eb q\u00eb edhe pagesa e mjeteve t\u00eb jet\u00eb me e ul\u00ebt.<\/p>\n<p>Por dyshimet shtohen edhe me tej, pasi edhe pse kontrata ka qen\u00eb mjaft t\u00ebrheq\u00ebse, mbi 317 milion euro p\u00ebr zgjerimin e vet\u00ebm 42,2 kilometrave rrug\u00eb ekzistuese dhe nd\u00ebrtimin e 3,8 kilometrave gjurm\u00eb e re, n\u00eb tender ka marr\u00eb pjes\u00eb vet\u00ebm nj\u00eb ofertues, nj\u00eb bashkim kompanish shqiptare.<\/p>\n<p>Vet\u00eb ministrja Belinda Balluku u kujdes n\u00eb hapjen e tenderin m\u00eb 2 gusht t\u00eb k\u00ebtij viti, p\u00ebr t\u00eb reklamuar projektin dhe t\u00ebrheqjen e sa m\u00eb shum\u00eb ofertave.<\/p>\n<p><em>\u201cKemi ndar\u00eb k\u00ebt\u00eb gjat\u00ebsi nga Miloti deri n\u00eb Fier q\u00eb \u00ebsht\u00eb 114 km kemi vendosur ta segmentojm\u00eb duke iu dh\u00ebn\u00eb m\u00eb shum\u00eb hap\u00ebsir\u00eb dhe mund\u00ebsi kompanive garuese q\u00eb t\u00eb sigurojn\u00eb financimin e duhur p\u00ebr nd\u00ebrtimin e secilit aks. Milot-Thuman\u00eb; Kashar-Lekaj e Rrogozhin\u00ebs dhe m\u00eb pas Lekaj-Fier do t\u00eb jen\u00eb nd\u00ebr akset p\u00ebrb\u00ebr\u00ebse t\u00eb k\u00ebtij korridori t\u00eb cilat nga sot po i lancojm\u00eb n\u00eb gar\u00ebn nd\u00ebrkomb\u00ebtare p\u00ebr nd\u00ebrtimin e tyre\u201d<\/em>, tha Balluku.<\/p>\n<p>Por n\u00eb fakt si\u00e7 rezultoi m\u00eb pas, gar\u00eb nuk pati dhe tenderi u mbyll me vet\u00ebm nj\u00eb ofert\u00eb p\u00ebr k\u00ebt\u00eb segment. Kjo kontrat\u00eb \u00ebsht\u00eb e dyta p\u00ebr segmentet e autostrad\u00ebs Milot-Fier.<\/p>\n<p>M\u00eb par\u00eb \u00ebsht\u00eb lidhur kontrata rreth 400 milion euro p\u00ebr segmentin Kashar-Thuman\u00eb, e cila u anulua, por q\u00eb m\u00eb pas u aktivizua p\u00ebrs\u00ebri nga qeveria pas vendimeve t\u00eb Gjykat\u00ebs Administrative.<\/p>\n<p>Nd\u00ebrkoh\u00eb shum\u00eb shpejt Ministria e Infrastruktur\u00ebs, pritet t\u00eb shpall\u00eb fituesit edhe p\u00ebr 2 segmente t\u00eb tjer\u00eb t\u00eb autostrad\u00ebs Milot-Fier, e cila pritet t\u00eb kushtoj\u00eb plot 1,23 miliard\u00eb euro.\/ <strong>Marr\u00eb nga BW<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Skandal me koncesionin 35 vje\u00e7ar p\u00ebr segmentin rrugor Lekaj-Konjat-Fier, pjes\u00eb e autostrad\u00ebs Milot-Fier. Ministria e Infrastruktur\u00ebs dhe energjis\u00eb drejtuar nga Belinda Balluku ka shpallur fituese ofert\u00ebn\u00a0 prej 320 milion euro dh\u00ebn\u00eb nga bashkimi i tet\u00eb kompanive, nd\u00ebrkoh\u00eb q\u00eb n\u00eb dokumentet zyrtar\u00eb t\u00eb shpalljes s\u00eb tenderit, projekti ishte parashikuar me nj\u00eb kosto prej 317,6 milion euro. [&hellip;]<\/p>\n","protected":false},"author":2037,"featured_media":296033,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[241,364,231,1454,235],"tags":[5663],"class_list":{"0":"post-299476","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-aktualitet","8":"category-koment-opinion","9":"category-lajme","10":"category-politike","11":"category-vendi","12":"tag-belinda-balluku"},"_links":{"self":[{"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/posts\/299476","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/users\/2037"}],"replies":[{"embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/comments?post=299476"}],"version-history":[{"count":0,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/posts\/299476\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/media\/296033"}],"wp:attachment":[{"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/media?parent=299476"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/categories?post=299476"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/tags?post=299476"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}