{"id":87161,"date":"2019-06-01T16:06:16","date_gmt":"2019-06-01T14:06:16","guid":{"rendered":"https:\/\/zjarr.tv\/?p=87161"},"modified":"2019-06-01T16:06:16","modified_gmt":"2019-06-01T14:06:16","slug":"milot-balldren-17-km-per-290-milion-euro-banka-europiane-nderton-bypassin-e-fierit-27-km-per-2-2-mln-euro","status":"publish","type":"post","link":"https:\/\/zjarr.tv\/en\/milot-balldren-17-km-per-290-milion-euro-banka-europiane-nderton-bypassin-e-fierit-27-km-per-2-2-mln-euro\/","title":{"rendered":"Milot-Balldren 17 km p\u00ebr 290 milion euro, Banka Europiane nd\u00ebrton Bypassin e Fierit 27 km p\u00ebr 2.2 mln euro"},"content":{"rendered":"<p>Ish-kryeministri Berisha e ka cil\u00ebsuar nj\u00eb vjedhje t\u00eb \u00e7mendur dhe t\u00eb paimagjinueshme t\u00eb Edi Ram\u00ebs, projektin 290 milion euro t\u00eb rrug\u00ebs Milot \u2013Balldren vet\u00ebm 17 km t\u00eb gjat\u00eb.<\/p>\n<p>Berisha e ka krahasuar k\u00ebt\u00eb rrug\u00eb me projektin e Bajpassit t\u00eb Fierit q\u00eb do t\u00eb nd\u00ebrtohet me fondet e Bank\u00ebs Europiane ku 27 km do t\u00eb nd\u00ebrtohen me 2,2 milion euro, nj\u00eb rrug\u00eb 10 km m\u00eb e gjat\u00eb se Milot-Balldren, por shum\u00eb her\u00eb m\u00eb e lir\u00eb se kjo e fundit<\/p>\n<p>\u2018Zgjerimi i rruges prej 17 km Milot &#8211; Balldren nga dy ne kater korsi me PPP do kushtoje 17 milion euro km<\/p>\n<p>Nderkohe qe 27 km ne Bajpasin e Fierit ndertohen nga Bankat Europiane me 2,2 milion euro.<\/p>\n<p>Te dashur miq, ne nje akt vjedhje te \u00e7mendur e te paimagjinueshme Edvin Kristaq Hajni, Ndrikullat e tij petullushka Riformata dhe Sekretia dhe Hajdut Gjiknuri kane vendosur me duart e tyre te zeza te vjedhin me thase te pakten 250 milion euro ne zgjerimin e rruges Milot &#8211; Balldren, nga dy ne kater korsi.<\/p>\n<p>Keta horra te pafytyre dhe shperfytyruar kane firmosur zgjerimin nga 2 ne kater korsi te 17 km te rruges fushore Milot -Balldren me PPP tu kushtoje takspaguesve shqiptare 290 milione Euro apo 17 milione euro per km apo 17 milion euro shtimi i dy korsive per km.<\/p>\n<p>Per te kuptuar permasat e kesaj vjedhje monstruoze po ju rikujtoj lexuesve se Bajpasi i Fierit, veper e financuar nga bankat europiane BEI dhe BERZH po ndertohet me 2,2 milion per km dhe para ketyre, po me financimin e ketyre bankave u ndertua autostrada Levan &#8211; Vlore me ura te gjata mbi Vjose dhe vepra te tjera arti.<\/p>\n<p>Po keshtu, tuneli prej 5,3 km te dy anet se bashku eshte ndertuar me 14 milione euro km. Sipas te gjitha krahasimeve me \u00e7mimet e veprave te ngjashme por edhe ato nderkombetare te ndertimit te autostradave ne teren fushor ky zgjerim nuk mund te kushtonte kurre me shume se 40 milione euro, \u00e7ka do te thote se kryehajduti me hajnat dhe horrat e tij vjedhin te pakten 250 milion euro.<\/p>\n<p>Ketu me poshte per ata qe jane te interesuar per hollesi me te medha keni deklaraten per shtyp dhe denoncimin e kesaj megaafere korruptive nga Partia Demokratike. sb<\/p>\n<ul>\n<li>Projekti mafioz i rrug\u00ebs prej 17 km Milot- Balldre, do t\u00eb kushtoj\u00eb 295 milion\u00eb euro, nga 254 milion\u00eb sa ishte parashikuar n\u00eb kontrat\u00eb, po p\u00ebrdoret p\u00ebr pastrimin e parave, po vjedh dhe zhvat qytetar\u00ebt, ka nxjerr\u00eb kostot m\u00eb t\u00eb larta p\u00ebr km t\u00eb rrug\u00ebve.<\/li>\n<li>Qeveria ia dha kontrat\u00ebn PPP, me ofert\u00eb t\u00eb pak\u00ebrkuar, kompanis\u00eb ANK, n\u00eb pron\u00ebsi t\u00eb nj\u00eb ish deputeti t\u00eb Partis\u00eb Socialiste, Agim Kola. Kontrata i hap rrug\u00eb rritjes fiktive t\u00eb kostos.<\/li>\n<li>Skema mafioze pjes\u00eb e s\u00eb cil\u00ebs \u00ebsht\u00eb Edi Rama, do t\u00eb detyroj\u00eb qytetar\u00ebt q\u00eb t\u00eb paguajn\u00eb 17 milion\u00eb euro p\u00ebr 1 kilomet\u00ebr, p\u00ebr nj\u00eb rrug\u00eb fushore.<\/li>\n<li>Departamenti Amerikan i Shtetit, shprehu qartazi shqet\u00ebsimin p\u00ebr k\u00ebto projekte me rrezikshm\u00ebri t\u00eb lart\u00eb, e m\u00eb pas FMN dhe institucione t\u00eb tjera serioze kan\u00eb shprehur shqet\u00ebsim n\u00eb lidhje me k\u00ebto projekte.<\/li>\n<li>Kjo kontrat\u00eb, nqs kalon n\u00eb Parlament, do t\u00eb jet\u00eb subjekt i Ligjit Antimafia, s\u00eb bashku me nj\u00eb list\u00eb kontratash abuzive t\u00eb denoncuara nga Partia Demokratike dhe \u00e7do d\u00ebm i shkaktuar ndaj buxhetit te shtetit do t\u00eb rekuperohet.<\/li>\n<\/ul>\n<p>DEKLARAT\u00cb JORIDA TABAKU DHE LEALBA PELINKU<\/p>\n<p>JORIDA TABAKU<\/p>\n<p>Opinioni publik \u00ebsht\u00eb njohur k\u00ebto dit\u00eb me nj\u00eb nga aferat m\u00eb t\u00eb r\u00ebnda korruptive t\u00eb qeveris\u00eb s\u00eb Edi Ram\u00ebs. B\u00ebhet fjal\u00eb p\u00ebr projektin 260 milion\u00eb euro t\u00eb rrug\u00ebs prej 17 kilometrash Milot- Balldre. Deri tani dim\u00eb q\u00eb qytetar\u00ebt do t\u00eb paguajn\u00eb 15 milion\u00eb euro p\u00ebr 1 kilomet\u00ebr, por dokumentat n\u00eb vazhdim na tregojn\u00eb se vlera mund t\u00eb rritet, duke e kthyer kontrat\u00ebn n\u00eb nj\u00eb skem\u00eb mafioze.<\/p>\n<p>Vlera e 1 kilometri, n\u00eb terren fushor, pa asnj\u00eb v\u00ebshtir\u00ebsi serioze, pa asnj\u00eb vep\u00ebr madhore arti, mund t\u00eb shkoj\u00eb edhe 17 milion\u00eb euro, sepse k\u00ebshtu ka vendosur Edi Rama.<\/p>\n<p>Afera \u00ebsht\u00eb pothuajse e ngjashme me at\u00eb t\u00eb Unaz\u00ebs s\u00eb Re, ku 1 kilomet\u00ebr kushton 20 milion\u00eb euro. Ndryshimi, n\u00eb rastin e Milot-Balldre, \u00ebsht\u00eb se p\u00ebr grabitjen e rradh\u00ebs nuk u shpik nj\u00eb kompani me dokumenta t\u00eb fallsfikuara, por qeveria ia dha kontrat\u00ebn PPP, me ofert\u00eb t\u00eb pak\u00ebrkuar, nj\u00eb kompanie t\u00eb vog\u00ebl q\u00eb, zyrtarisht, \u00ebsht\u00eb n\u00eb pron\u00ebsi t\u00eb nj\u00eb ish deputeti t\u00eb Partis\u00eb Socialiste, Agim Kola dhe q\u00eb p\u00ebr partner n\u00eb punime, ka klonimin e vetes, n\u00ebp\u00ebrmjet hapjes s\u00eb nj\u00eb kompanie, q\u00eb nuk ka kryer asnj\u00eb pun\u00eb deri m\u00eb sot.<\/p>\n<p>\u00cbsht\u00eb detyr\u00eb e prokuroris\u00eb t\u00eb zbuloj\u00eb p\u00ebrfituesit e v\u00ebrtet\u00eb dhe t\u00eb tregoj\u00eb se deri ku dhe me k\u00eb \u00ebsht\u00eb p\u00ebrfshir\u00eb kryeministri i vendit n\u00eb k\u00ebt\u00eb afer\u00eb mafioze q\u00eb u grabit shqiptar\u00ebve miliona e miliona euro.<\/p>\n<p>P\u00ebr t\u00eb kuptuar skem\u00ebn mafioze, duhen shpjeguar s\u00eb pari kostot e projektit prej 17 kilometrash.<\/p>\n<ol>\n<li>KOSTO<\/li>\n<\/ol>\n<ul>\n<li>n\u00eb Buxhetin 2018 ky projekt u parashikua 113 mln euro.<\/li>\n<li>Me pas, tenderi u hap me 50 milion\u00eb euro m\u00eb shum\u00eb, duke e \u00e7uar vler\u00ebn ne 161,5 mln euro.<\/li>\n<li>N\u00eb kontrat\u00eb vlera shkon n\u00eb 216 mln euro, bashk\u00eb me tvsh do t\u00eb kushtoj\u00eb 256 mln euro.<\/li>\n<li>Por kjo nuk \u00ebsht\u00eb kosto p\u00ebrfundimtare. N\u00eb tabel\u00ebn e p\u00ebrgatitur p\u00ebr pagesat p\u00ebr projektet PPP vlera \u00ebsht\u00eb 295 mln Euro, edhe 40 milion\u00eb euro m\u00eb shum\u00eb.<\/li>\n<li>Kjo rritje skandaloze e kostos s\u00eb rrug\u00ebs do t\u00eb b\u00ebhet me vendim parlamenti. Kontrata q\u00eb do t\u00eb miratohet nga ushtar\u00ebt e Edi Ram\u00ebs n\u00eb parlament, l\u00eb hap\u00ebsir\u00eb q\u00eb me k\u00ebrkes\u00eb t\u00eb kontraktorit gjat\u00eb punimeve, kostoja t\u00eb ndryshoj\u00eb. K\u00ebt\u00eb e konfirmon neni 35,2 i kontrat\u00ebs.<\/li>\n<li>Pjes\u00eb e skem\u00ebs mafioze, q\u00eb sjell kosto shtes\u00eb n\u00eb buxhetin e shtetit \u00ebsht\u00eb monedha n\u00eb t\u00eb cil\u00ebn \u00ebsht\u00eb firmosur kontrata. Ato nuk jan\u00eb n\u00eb lek, por n\u00eb euro, duke rrezikuar nj\u00eb d\u00ebm edhe m\u00eb t\u00eb madh n\u00eb t\u00eb ardhmen, ku buxhetit do t\u2019i duhet t\u00eb paguaj\u00eb m\u00eb shum\u00eb para p\u00ebr t\u00eb shlyer detyrimin n\u00eb euro.<\/li>\n<\/ul>\n<p>\u00cbsht\u00eb e qart\u00eb se kushdo q\u00eb ka ideuar dhe konceptuar k\u00ebt\u00eb projekt mafioz duhet t\u00eb shkoj\u00eb para drejt\u00ebsis\u00eb. Skema mafioze q\u00eb grabit shqiptar\u00ebt me miliona euro e ka zanafill\u00ebn tek tenderi korruptiv.<\/p>\n<ol start=\"2\">\n<li>TENDERI<\/li>\n<\/ol>\n<ul>\n<li>N\u00eb tetor 2018 u shpallu tenderi me vler\u00eb 161 mln euro. Por vlera e kontrat\u00ebs u rrit pas shpalljes s\u00eb tenderit, koh\u00eb n\u00eb t\u00eb cil\u00ebn ndodhi rinegocimi.<\/li>\n<li>P\u00ebr her\u00eb t\u00eb par\u00eb n\u00eb historin\u00eb e kontratave publike, kjo b\u00ebri q\u00eb vlera e plot\u00eb e projektit t\u00eb jet\u00eb m\u00eb e lart\u00eb se vlera e tenderuar. (sipas kontrat\u00ebs \u00ebsht\u00eb 213 mln euro pa tvsh nderkoh\u00ebe q\u00eb \u00ebsht\u00eb tenderuar p\u00ebr 161 mln euro. Pa gar\u00eb, pa transparenc\u00eb e p\u00ebrcaktuar.<\/li>\n<li>Kjo kontrat\u00eb duhej t\u00eb ishte tenderuar p\u00ebr vler\u00ebn e plot\u00eb t\u00eb punimeve dhe p\u00ebr vler\u00ebn e plot\u00eb t\u00eb interesave dhe kredis\u00eb bankare q\u00eb po merret me 5%.<\/li>\n<li>Kjo kontrat\u00eb e fituar nga Firma ANK si ofert\u00eb e pak\u00ebrkuar \u00ebsht\u00eb b\u00ebr\u00eb n\u00eb interes t\u00eb privatit, jo t\u00eb shtetit. Sa her\u00eb q\u00eb kjo firm\u00eb has v\u00ebshtir\u00ebsi n\u00eb kryerjen e pun\u00ebs apo kostot e pun\u00ebtor\u00ebve t\u00eb saj rriten, firmao mund t\u00eb rris\u00eb koston e PPP-s\u00eb nd\u00ebrsa shteti \u00ebsht\u00eb i detyruar t\u00eb pranoj\u00eb k\u00ebrkesat e saj, duke mbuluar \u00e7do kosto, duke e mbrojtur nga \u00e7do rrezik.<\/li>\n<\/ul>\n<p>LEALBA PELINKU<\/p>\n<ol start=\"3\">\n<li>KOMPANIA<\/li>\n<\/ol>\n<p>Krijimi i kompanis\u00eb \u00ebsht\u00eb nj\u00eb tjet\u00ebr pjes\u00eb e skem\u00ebs mafioze.<\/p>\n<ul>\n<li>Ky propozim i pak\u00ebrkuar fitoi si i till\u00eb duke qen\u00eb nj\u00eb bashkim operator\u00ebsh, m\u00eb sakt\u00eb kompanis\u00eb ANK dhe Bardhi Konstruksion SHPK. Kjo e fundit, krijuar n\u00eb fund t\u00eb vitit 2018, me kapital 100 mij\u00eb lek\u00eb, do t\u00eb merrej me projektimin, nd\u00ebrtimin dhe mir\u00ebmbajtjen,nd\u00ebrkoh\u00eb q\u00eb, si tregohet nga ekstrakti I kompanis\u00eb, kompania Bardhi Konstruksion Shpk ka ortak t\u00eb saj po kompanin\u00eb ANK. Pra b\u00ebhet fjal\u00eb vet\u00ebm p\u00ebr nj\u00eb operator, ish deputetin e partise Socialiste Agim Kola.<\/li>\n<li>Shoq\u00ebria e dyt\u00eb pse \u00ebsht\u00eb eshte bere pjese e bashkimit te operatoreve? Nuk ka asnj\u00eb kapacitet shtes\u00eb, sepse \u00ebsht\u00eb e sapoformuar. Dyshimi i arsyesh\u00ebm q\u00eb lind \u00ebsht\u00eb q\u00eb kjo shoq\u00ebri \u00ebsht\u00eb krijuar p\u00ebr t\u00eb formalizuar dhe futur n\u00eb loj\u00eb parat\u00eb e pista, nj\u00eb skem\u00eb e ngjashme kjo me Unazen e Re.<\/li>\n<li>Kompania ka aktive prej 2 mld lek\u00ebsh (20 mln euro) t\u00eb cilat nuk mund t\u00eb angazhohen t\u00eb gjitha p\u00ebr k\u00ebt\u00eb objekt, nd\u00ebrkoh\u00eb q\u00eb deklaron se ka 50 milion\u00eb Euro p\u00ebr t\u2019i investuar n\u00eb k\u00ebt\u00eb projekt dhe do t\u00eb marr\u00eb nj\u00eb kredi me garanci sovrane p\u00ebr t\u00eb nd\u00ebrtuar rrug\u00ebn. Kjo kredi fare mire mund te ishte marr\u00eb nga shteti me interesa m\u00eb t\u00eb ul\u00ebta, nderkoh\u00eb q\u00eb po e merr privati me interes 5%.<\/li>\n<li>P\u00ebr nj\u00eb rrug\u00eb q\u00eb koston fillestare e kishte 113 milion\u00eb euro, buxheti i shtetit po paguan rreth 3-fishin e vler\u00ebs, q\u00eb mund t\u00eb shkoj\u00eb deri n\u00eb 300 mln euro dhe investime me norma kaq t\u00eb larta fitimi, nuk ka asnj\u00eb biznes u ndersh\u00ebm.<\/li>\n<li>Nj\u00eb kontrat\u00eb e till\u00eb \u00ebsht\u00eb tejet favorizuese p\u00ebr kompanin\u00eb dhe e shnd\u00ebrron shtetin n\u00eb \u00e7irakun e saj. Asnj\u00eb pik\u00eb e kontrat\u00ebs nuk garanton pal\u00ebn publike dhe shqiptar\u00ebt, p\u00ebrkundrazi, gjith\u00e7ka \u00ebsht\u00eb vendosur n\u00eb favor t\u00eb nj\u00ebr\u00ebs pal\u00eb,duke e shnd\u00ebrruar kontrat\u00ebn n\u00eb pazar t\u00eb nj\u00ebansh\u00ebm.<\/li>\n<\/ul>\n<p>Kur qeveria lancoi dy vite m\u00eb par\u00eb programin 1 mld euro t\u00eb PPP, Partia Demokratike e quajti k\u00ebt\u00eb nj\u00eb skeme t\u00eb Pastrimit t\u00eb Parave t\u00eb Pista, duke e ditur q\u00eb do t\u00eb arrinim n\u00eb k\u00ebt\u00eb nivel dhe duke e ditur q\u00eb asnj\u00eb biznes i ndersh\u00ebm nuk do t\u00eb kishte k\u00ebt\u00eb kapital n\u00eb dispozicion!<\/p>\n<p>I k\u00ebtij mendimi ishte edhe Departamenti Amerikan i Shtetit, i cili shprehu qartazi shqet\u00ebsimin p\u00ebr k\u00ebto projekte me rrezikshm\u00ebri t\u00eb lart\u00eb, e m\u00eb pas FMN dhe institucione t\u00eb tjera serioze kan\u00eb shprehur shqet\u00ebsim n\u00eb lidhje me k\u00ebto projekte.<\/p>\n<p>JORIDA TABAKU<\/p>\n<p>Sot, fatkeq\u00ebsisht ajo q\u00eb ne parashikuam po ndodh. Ky program po p\u00ebrdoret p\u00ebr pastrimin e parave, ky program po vjedh dhe zhvat qytetar\u00ebt, ky program ka nxjerr\u00eb kostot m\u00ebt\u00eb larta p\u00ebr km t\u00eb rrug\u00ebve, q\u00eb, n\u00eb Unaz\u00ebn e re shkonin n\u00eb 22 mln euro\/km dhe k\u00ebtu deri n\u00eb 16 mln euro p\u00ebr km. Kjo skem\u00eb korruptive gjigande, q\u00eb si\u00e7 tregohet n\u00eb tabel\u00ebn e siguruar nga Partia Demokratike, qe do t\u00eb ket\u00eb efekte p\u00ebr 15 vitet n\u00eb vijim, duhet t\u00eb ndalet menj\u00ebher\u00eb.<\/p>\n<p>Kjo kontrat\u00eb, nqs kalon n\u00eb parlament, do t\u00eb jet\u00eb subjekt i Ligjit Antimafia, s\u00eb bashku me nj\u00eb list\u00eb kontratash abuzive t\u00eb denoncuara nga Partia Demokratike dhe \u00e7do d\u00ebm i shkaktuar ndaj buxhetit te shtetit do t\u00eb rekuperohet. Korrupsioni me ligje t\u00eb miratuara n\u00eb parlament, ku k\u00ebrkojn\u00eb mbrojtje p\u00ebr vendimet e tyre duhet t\u00eb mbaroj\u00eb. Nuk ka parlament ilegjitim q\u00eb mbron k\u00ebto veprime korruptive, e nuk ka gjykat\u00eb e arbitrazhi q\u00eb mbron vendimet e nj\u00ebparlamenti ilegjitim!<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Ish-kryeministri Berisha e ka cil\u00ebsuar nj\u00eb vjedhje t\u00eb \u00e7mendur dhe t\u00eb paimagjinueshme t\u00eb Edi Ram\u00ebs, projektin 290 milion euro t\u00eb rrug\u00ebs Milot \u2013Balldren vet\u00ebm 17 km t\u00eb gjat\u00eb. Berisha e ka krahasuar k\u00ebt\u00eb rrug\u00eb me projektin e Bajpassit t\u00eb Fierit q\u00eb do t\u00eb nd\u00ebrtohet me fondet e Bank\u00ebs Europiane ku 27 km do t\u00eb nd\u00ebrtohen [&hellip;]<\/p>\n","protected":false},"author":2013,"featured_media":66422,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[241,235],"tags":[],"class_list":{"0":"post-87161","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-aktualitet","8":"category-vendi"},"_links":{"self":[{"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/posts\/87161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/users\/2013"}],"replies":[{"embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/comments?post=87161"}],"version-history":[{"count":0,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/posts\/87161\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/media\/66422"}],"wp:attachment":[{"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/media?parent=87161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/categories?post=87161"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zjarr.tv\/en\/wp-json\/wp\/v2\/tags?post=87161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}