{"id":320353,"date":"2023-05-02T08:11:34","date_gmt":"2023-05-02T06:11:34","guid":{"rendered":"https:\/\/zjarr.tv\/?p=320353"},"modified":"2023-05-02T08:11:34","modified_gmt":"2023-05-02T06:11:34","slug":"porti-i-ri-tregtar-ne-durres-ende-pa-projekt-teknik-nato-kunder-masterplanit-nuk-i-permbahet-kapaciteteve-per-ankorimin-e-anijeve","status":"publish","type":"post","link":"https:\/\/zjarr.tv\/sq\/porti-i-ri-tregtar-ne-durres-ende-pa-projekt-teknik-nato-kunder-masterplanit-nuk-i-permbahet-kapaciteteve-per-ankorimin-e-anijeve\/","title":{"rendered":"Porti i ri tregtar n\u00eb Durr\u00ebs ende pa projekt teknik, NATO kund\u00ebr masterplanit: Nuk i p\u00ebrmbahet kapaciteteve p\u00ebr ankorimin e anijeve"},"content":{"rendered":"<p>Porti i ri tregtar, nj\u00eb vep\u00ebr me r\u00ebnd\u00ebsi strategjike q\u00eb parashikohet t\u00eb nd\u00ebrtohet n\u00eb Porto Romano ende nuk ka nj\u00eb projekt t\u00eb detajuar teknik.<\/p>\n<p>Pavar\u00ebsisht se afatet p\u00ebr p\u00ebrfundimin e hartimit t\u00eb projektit t\u00eb fizibilitetit nga 8 muaj u shtyn\u00eb n\u00eb 15 muaj, ende ai nuk \u00ebsht\u00eb dor\u00ebzuar.<\/p>\n<p>Shkak p\u00ebr shtyrjen e afateve t\u00eb p\u00ebrfundimit t\u00eb studimit t\u00eb fizibilitetit sipas njoftimit n\u00eb Autoritetin e Prokurimeve Publike (APP) nga Autoritetit Portual Durr\u00ebs (APD) n\u00eb shtator 2022 m\u00ebsohet t\u00eb ket\u00eb qen\u00eb kund\u00ebrshtimi i masterplanit t\u00eb portit t\u00eb ri tregtar n\u00eb Porto Romano nga NATO, pasi ky projekt nuk i p\u00ebrmbahej kapaciteteve t\u00eb NATO-s p\u00ebr akostimin e mjeteve detare dhe sheshet n\u00eb sh\u00ebrbim p\u00ebr forcat e armatosura.<\/p>\n<p>Masterplani p\u00ebr projektin e ri tregtar \u00ebsht\u00eb hartuar nga kompania holandeze \u201cRoyal Haskoning\u201d dhe u prezantua p\u00ebr publikun n\u00eb dhjetor t\u00eb vitit t\u00eb kaluar nga autoritetet shqiptare. Do t\u00eb jet\u00eb s\u00ebrish kompania holandeze q\u00eb do t\u00eb hartoj\u00eb studimin e fizibilitetit t\u00eb portit t\u00eb ri. Por burime nga tregu i industris\u00eb detare pohuan p\u00ebr \u201cMonitor\u201d se pritet q\u00eb s\u00ebrish t\u00eb k\u00ebt\u00eb shtyrje t\u00eb realizimit t\u00eb projektit \u00eb cila pritet t\u00eb k\u00ebrkoj\u00eb s\u00ebrish fonde shtes\u00eb.<\/p>\n<p>P\u00ebr shtyrjen e afatit t\u00eb p\u00ebrfundimit t\u00eb hartimit t\u00eb projektit teknik t\u00eb portit n\u00eb tender u shtua fondi me vler\u00eb 223,2 mln lek\u00eb.<\/p>\n<p>Fillimisht afati p\u00ebr p\u00ebrfundimin e projektit t\u00eb detajuar teknik t\u00eb portit t\u00eb ri tregtar t\u00eb integruar t\u00eb Durr\u00ebsit n\u00eb Porto Romano referuar shpalljes s\u00eb njoftimit t\u00eb tenderit nga APD n\u00eb APP n\u00eb janar t\u00eb 2022-s ishte 8 muaj nga data e n\u00ebnshkrimit t\u00eb kontrat\u00ebs. Kontrata \u00ebsht\u00eb n\u00ebnshkruar m\u00eb 21 dhjetor 2021 dhe studimi i fizibilitetit duhej t\u00eb dor\u00ebzohej n\u00eb gusht t\u00eb vitit 2022. Nd\u00ebrsa fondi i prokurimit ishte me 1,145,354,372 lek\u00eb.<\/p>\n<p>Por Autoriteti Portual Durr\u00ebs n\u00eb shtator t\u00eb 2022-it ka qen\u00eb i detyruar t\u00eb ndryshoj\u00eb afatet e p\u00ebrfundimit t\u00eb projektit teknik nga 8 muaj n\u00eb 15 muaj (me afatet e reja projekti teknik duhet t\u00eb dor\u00ebzohej i plot\u00eb n\u00eb mars t\u00eb 2023-it) si dhe t\u00eb shtoj\u00eb 19,5% fondin p\u00ebr realizimin e sh\u00ebrbimit. Fondi i ri i prokurimit ishte n\u00eb vler\u00ebn e 1,365,777,813 lek\u00ebve. Shkak i shtyrjes s\u00eb afatit ishte ndryshimi i masterplanit p\u00ebr projektimin e baz\u00ebs detare, q\u00eb binte n\u00eb kund\u00ebrshtim me standardet e NATO-s , pasi nuk i p\u00ebrmbahej kapaciteteve t\u00eb tyre.<\/p>\n<p>\u201cNj\u00eb aspekt thelb\u00ebsor i k\u00ebtij projekti \u00ebsht\u00eb nd\u00ebrtimi i nj\u00eb baze autonome detare p\u00ebr Forc\u00ebn Detare t\u00eb R.SH., t\u00eb nd\u00ebrlidhur me rrjetin rrugor dhe hekurudhor. Komanda e Forc\u00ebs Detare, duke u koordinuar me p\u00ebrfaq\u00ebsuesit Amerikan\u00eb, t\u00eb cil\u00ebt n\u00ebp\u00ebrmjet Shtabit t\u00eb P\u00ebrgjithsh\u00ebm kan\u00eb d\u00ebrguar k\u00ebrkesat specifike, i ka p\u00ebrcjell\u00eb Autoritetit Portual Durr\u00ebs kapacitetet q\u00eb nevojiten, duke u bazuar n\u00eb: inventarin aktual t\u00eb anijeve t\u00eb Forc\u00ebs Detare, anijet q\u00eb kan\u00eb vizituar vendin ton\u00eb n\u00eb kuad\u00ebr t\u00eb st\u00ebrvitjeve t\u00eb vendeve aleate si \u201cdefender Europe 21\u201d dhe mund\u00ebsin\u00eb p\u00ebr akomodimin e t\u00eb gjitha anijeve t\u00eb tipit \u201cdestroyer\u201d.<\/p>\n<p>Kjo ide, e artikuluar n\u00eb nivel koordinimi politik, gjat\u00eb Ministerialit t\u00eb Ministrave t\u00eb Mbrojtjes s\u00eb NATO-s n\u00eb Bruksel, n\u00eb datat 15-16 qershor, ka gjetur parimisht dhe mb\u00ebshtetjen e SACEUR, duke k\u00ebrkuar q\u00eb autoritetet shqiptare t\u00eb detajoj\u00eb edhe m\u00eb tej projektin e tyre, duke b\u00ebr\u00eb z\u00ebvend\u00ebsimin e z\u00ebrit projektimit p\u00ebr baz\u00ebn autonome detare p\u00ebr forc\u00ebn detare te R.Sh , n\u00eb zon\u00eb p\u00ebr p\u00ebrdorimin e forcave te NATO-s.<\/p>\n<p>Projekti i infrastruktur\u00ebs i destinuar p\u00ebr akostimin e mjeteve detare dhe sheshet n\u00eb sh\u00ebrbim p\u00ebr forcat e armatosura sipas MASTERPLANIT nuk i p\u00ebrmbahet kapaciteteve t\u00eb k\u00ebrkuara nga NATO.<\/p>\n<p>P\u00ebr sa m\u00eb lart argumentuar, paraqitet nevoja p\u00ebr amendimin e kontrat\u00ebs fillestare, duke u ndryshuar afati i zbatimit dhe vlera totale e kontrat\u00ebs s\u00eb prokurimit n\u00eb fjal\u00eb. Vlera e amendimit nuk tejkalon mas\u00ebn prej 20% t\u00eb vler\u00ebs s\u00eb kontrat\u00ebs fillestare\u201d, citohet n\u00eb dokumentet e prokurimit t\u00eb tenderit.<\/p>\n<p>Porti i Durr\u00ebsit do t\u00eb zhvendoset n\u00eb Porto Romane p\u00ebr ti hapur rrug\u00eb zhvillimit t\u00eb projektit q\u00eb e shnd\u00ebrron at\u00eb n\u00eb port turistik, nj\u00eb nism\u00eb q\u00eb ka hasur debate p\u00ebr faktin e formul\u00ebs s\u00eb financimit dhe sip\u00ebrfaqes s\u00eb lart\u00eb q\u00eb do t\u00eb jepet p\u00ebr nd\u00ebrtime real estate.\/Monitor<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Porti i ri tregtar, nj\u00eb vep\u00ebr me r\u00ebnd\u00ebsi strategjike q\u00eb parashikohet t\u00eb nd\u00ebrtohet n\u00eb Porto Romano ende nuk ka nj\u00eb projekt t\u00eb detajuar teknik. Pavar\u00ebsisht se afatet p\u00ebr p\u00ebrfundimin e hartimit t\u00eb projektit t\u00eb fizibilitetit nga 8 muaj u shtyn\u00eb n\u00eb 15 muaj, ende ai nuk \u00ebsht\u00eb dor\u00ebzuar. Shkak p\u00ebr shtyrjen e afateve t\u00eb p\u00ebrfundimit [&hellip;]<\/p>\n","protected":false},"author":2031,"featured_media":320354,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[241,231,235],"tags":[],"class_list":{"0":"post-320353","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-aktualitet","8":"category-lajme","9":"category-vendi"},"_links":{"self":[{"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/posts\/320353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/users\/2031"}],"replies":[{"embeddable":true,"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/comments?post=320353"}],"version-history":[{"count":0,"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/posts\/320353\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/media\/320354"}],"wp:attachment":[{"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/media?parent=320353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/categories?post=320353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zjarr.tv\/sq\/wp-json\/wp\/v2\/tags?post=320353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}